Current Position - Home > Industry > Reduction of Reduction of steel production capacity will reach 11 million tons in Tianjin City

Reduction of Reduction of steel production capacity will reach 11 million tons in Tianjin City
2017-6-29 13:20:40
       In 2016, It has reduced production capacity for pig iron by 1.59 million tons in Tianjin City, including close down a 1080 cubic meters of blast furnace of Tianjin iron and steel group; a 450 cubic meters of blast furnace of  No.1 Rolling mill factory of Tianjin metallurgy iron and steel group. It has reduced production capacity of crude steel by 3.7 million tons, including two sets of 110 tons of electric furnace of Tianjin iron and steel group, one 40 tons converter of No.1 rolling mill factory metallurgy YAYI iron and steel group, a 45 tons converter of Tianjin Tiantie metallurgical group.
         In 2017, it is plan to reduce  production capacity 1.75 million tons for pig iron and 1.8 million tons for crude steel, including reduce a 160 tons of converter and a 450 cubic meters of blast furnace, two 505 cubic meters of blast furnace.
                                                                    (Marketing Dept.Beijing)